The foundation hole was dug today, and we’re on a solid sheet of bedrock. A geological engineer will be on site tomorrow morning to inspect it. The driveway is done. It received another 2 dump truck loads of gravel. We still haven’t made an official “drive” on the driveway yet. Next step, footings!